To Do list



  • Lengthen my very dear friend Brian's V-neck tank (SK860 and Alpaca yarn [harvested from his own Alpaca]). The top has been separated from the rib section. I have picked up the live stitches from the bottom of the top - if you know what I mean!  I will hang on the machine (upside down) and knit stocking stitch for about 3 inches and then redo the rib. The garment when finished will be posted on my Gallery page.
 
     
      Early design thoughts
    
  • Sydney's Red Riding Hood cape (design completed - DAK8). 















      
  • 'In the Pink' ladies cardigan (work in progress).  http://www.yours.co.uk/upload/6211/Issue%2066%20page%201.pdf  Need to redo this as I took a short cut; instead of reforming plain to purl, I opted to do a slip/skip stich and then reform this was to achieve a 3 seed/moss stitch border.  Didn't work!  Tension much too tight.     In the words of Craig Revel Horwood (from Strictly Come Dancing) "It's a disaaarster, Daaarling!"

  • Fray All Saints jumper

  • My take on Hanne Falkenberg's 'Dacapo'
    
    Primitive sketch
     
  • More dog coats
 
  • Try some of Diana Sullivan's Enchanted Lace Edgings - ordered from Diana Sullivan.
 

  • Thread lace circular table cloth
 


No comments:

Post a Comment